I'm getting closer on final inspection. I have **** loads of insulation (R30 behind R19 on the outer walls), and they finished drywall yesterday. I'm going to spray the inside. I'm wondering if it's better to install all the switches and outlets (minus the faceplates) and tape them, or just spray the wires. My thought is that it's better to install them and tape them to limit how much paint gets in there. Anybody have a preference?
I'm also wondering if anyone has a preference on finishing plywood that is inside the shop. The outer walls are 3/4 ply and I'm thinking i'll patch the cracks between the boards, and spray that too. I wouldn't bother patching over the nail holes.
I'm also wondering if anyone has a preference on finishing plywood that is inside the shop. The outer walls are 3/4 ply and I'm thinking i'll patch the cracks between the boards, and spray that too. I wouldn't bother patching over the nail holes.

