Andrew Drizmo
Member
My concrete is spalling and pitting. Garage is 650sqft.
I attached pictures.
I'm wanting to put in a 2 post lift. Obviously not where the spalling is.
From what I am seeing the options are to either break the concrete out and re-pour an area for the lift or just get the pad re-poured ( quoted $10k for a complete re-pour).
Not sure what to do, first time home owner and just want a comfortable space to build my vette!
I attached pictures.
I'm wanting to put in a 2 post lift. Obviously not where the spalling is.
From what I am seeing the options are to either break the concrete out and re-pour an area for the lift or just get the pad re-poured ( quoted $10k for a complete re-pour).
Not sure what to do, first time home owner and just want a comfortable space to build my vette!