billsnogo
Member
I have 16" on center 2x6 studs, and have my breaker box flush mounted. I should have insulated behind the box before it was installed, but too late now. There is only about 1.5" of space behind it, and I can not get the rigid foam board behind it due to the nails from the siding poking through. I can split some fiberglass insulation and try and pull it, but think the nails will pretty much shred it.
Anyone have a similar situation? I need to get something behind there, it gets cold here during the winter, and hot/humid during the summer and really need to get something behind there as it will be temp controlled year round so I can play with my cnc mill anytime
thanks to anyone with helpful suggestions.
Anyone have a similar situation? I need to get something behind there, it gets cold here during the winter, and hot/humid during the summer and really need to get something behind there as it will be temp controlled year round so I can play with my cnc mill anytime

thanks to anyone with helpful suggestions.


