Well-known member
They are about to pour the floor in my 30X60 garage in the morning and the question I have is they put 2" foam on the inside of the footings. It now has 2" foam on the base with pex, 1" of sand, wire mesh and rebar. The question I have is they left about 6" of foam sticking out to the top of the foundation. I thought that it would be cut out before they pour the slab. Please advise. Thanks...Mark