Hello everyone, I am finishing up a Versatube metal garage build (build thread coming soon). It is permitted and will be inspected.
I am about ready to put on the roof panels. What I would really like to do is to put 1 1/2 Thremasheath Polyiso foam under the roof panels. From everything I have researched, polyiso or polystyrene foam, or craft faced batt insulation is required to have 15 minute thermal barrier of 1/2" sheetrock or wood between the interior of the building. I do not want to have to do this; I want to be able to leave the ceiling unfinished.
Does this code still apply to a residential non-liveable space? The exact wording on my city permit states "detached metal storage building."
Thanks
I am about ready to put on the roof panels. What I would really like to do is to put 1 1/2 Thremasheath Polyiso foam under the roof panels. From everything I have researched, polyiso or polystyrene foam, or craft faced batt insulation is required to have 15 minute thermal barrier of 1/2" sheetrock or wood between the interior of the building. I do not want to have to do this; I want to be able to leave the ceiling unfinished.
Does this code still apply to a residential non-liveable space? The exact wording on my city permit states "detached metal storage building."