larry4406
Well-known member
Glad to hear that someone at the Authority Having Jurisdiction (AHJ) has some compassion and was willing to work with you!I talked to the city building department today. They said that technically there is a six month limit on how long between any activity on a permit, but that can be waived by the city building official. He said that because the building is 100% finished on the exterior that he would waive the six month limit for me. He would rather see me finish the electrical before summer rather than remove the panel. He said I would need to remove the panel to get the final inspection now since I don't have a signed off electrical permit.
The six month limit on pauses on construction is more for the folks who build a shell with housewrap and then don't ever finish the project for years. There have been plenty of people who stop as soon as the roof is on and the housewrap installed. The sun and wind destroy the housewrap over time, and then rain/snow start to destroy the OSB sheathing. Neighbors start complaining because it is an eyesore, and it drags down property values.
Get well! We want to see you working in this garage!
