Why do I get this stuff?
Moved to a new company a couple weeks back; yes a doors a door, but the hardware is different between manufacturers... capabilities are different, takes a while to figure out all those things...
So literally 5 days in - I get sent 2 hours out of town... doors need 15", I have 12... might work...
Oh, that's old growth fir, custom milled and stained, as a mounting surface... (I hear later there's 130,000$ just in stain (materials
) on this 'cottage'). No room for mistakes, and let's make it work...
Oi... do people not understand "practice in private before performing in public"?
Yeah, made it work, one misplaced hole on 2 doors.... (and it got hidden by the bracket) but can you say stress inducing? The framing cost more than the doors I was installing...
Moved to a new company a couple weeks back; yes a doors a door, but the hardware is different between manufacturers... capabilities are different, takes a while to figure out all those things...
So literally 5 days in - I get sent 2 hours out of town... doors need 15", I have 12... might work...
Oh, that's old growth fir, custom milled and stained, as a mounting surface... (I hear later there's 130,000$ just in stain (materials
) on this 'cottage'). No room for mistakes, and let's make it work...

Oi... do people not understand "practice in private before performing in public"?
Yeah, made it work, one misplaced hole on 2 doors.... (and it got hidden by the bracket) but can you say stress inducing? The framing cost more than the doors I was installing...
