Hello, this week the wife and I have been doing the floor in the breezeway that is connected to the garage..

it's 7'10" wide and 7'11" deep
so I rounded up to 8 feet x 8 feet..
so the sq. feet I thought was 64 sq. ft.
but the self leveling underlayment mortar/cement .. said on the bag, that at
1/8" think.. 2 bags should almost make it, so I figured 3 just to be safe..
three didn't do it.. it was 4...
had same issue with the title adhesive.. going by the bag.. one should've done it.. figured 2.. so far 3.. went to work before wife finished for the night so not sure if she killed the 3rd bag. or if there is still some in the bag..

is my math off..
is how far product goes that far off.
we didn't have this issue when we tiled the kitchen..
 
To avoid these ads, REGISTER NOW!

Kensgarage

Banned
Joined
Sep 30, 2015
Messages
442
Hello, this week the wife and I have been doing the floor in the breezeway that is connected to the garage..

it's 7'10" wide and 7'11" deep
so I rounded up to 8 feet x 8 feet..
so the sq. feet I thought was 64 sq. ft.
but the self leveling underlayment mortar/cement .. said on the bag, that at
1/8" think.. 2 bags should almost make it, so I figured 3 just to be safe..
three didn't do it.. it was 4...
had same issue with the title adhesive.. going by the bag.. one should've done it.. figured 2.. so far 3.. went to work before wife finished for the night so not sure if she killed the 3rd bag. or if there is still some in the bag..

is my math off..
is how far product goes that far off.
we didn't have this issue when we tiled the kitchen..
I don't think your math is off. I think you probably can't tell the diff betwixt 1/8 and 3/16 thick
 
To avoid these ads, REGISTER NOW!

larry_g

Well-known member
Joined
Apr 28, 2007
Messages
16,933
Location
oregon
Take a look at your procedure. Are your mixing buckets scraped clean, or a bit of waste there? Do you stop and clean your tools intermittently, wasting a bit more? A bit over the edge lost in the flower bed? As said above, if your putting down 3/16" and not an 1/8" then your using 50% more material.

lg
no neat sig line
 

Shea

Well-known member
Joined
Sep 19, 2012
Messages
2,872
Location
California
Math is good. At issue most times with problems like this is that 1/8" of self-leveling mix is much thinner than people anticipate. My guess is that it's going on 3/16" to 1/4" thick.
 

James-W

Well-known member
Joined
Feb 3, 2013
Messages
12,432
Location
Southeastern Wisconsin
It is pretty easy to spread it thicker than you think you are spreading it. I normally buy more than I figure I will need, then I return what I didn't use. I find it is easier to return the unused product than it is to go back to the store in the middle of the job to get more of it.
 