I'm getting ready to pull the trigger on my 40x60x15 shop. I have three quotes for similar spec'ed buildings (2 overhead doors, 1 personnel door and insulation).
Option 1 Mueller Bolt Together - http://www.muellerinc.com ~$37k
Very similar to this build. http://www.garagejournal.com/forum/showthread.php?t=152171
Option 2 Turn Key Weld Up - http://www.scherer-built.com ~$40k
Option 3 Turn Key Weld Up - http://www.trmetalbuildings.com ~$40k
I've seen examples from all three potential vendors and all have their pluses and minuses compared to the others.
Any thoughts on bolted vs welded or any other helpful information?
Option 1 Mueller Bolt Together - http://www.muellerinc.com ~$37k
Very similar to this build. http://www.garagejournal.com/forum/showthread.php?t=152171
Option 2 Turn Key Weld Up - http://www.scherer-built.com ~$40k
Option 3 Turn Key Weld Up - http://www.trmetalbuildings.com ~$40k
I've seen examples from all three potential vendors and all have their pluses and minuses compared to the others.
Any thoughts on bolted vs welded or any other helpful information?