I'm building a lean-to that is 7.5' wide with rafters on 16" spacing. I messed up when placing the rafters by not allowing enough room for a 2x4 purlin plus the tin on top of the rafters, and it still fit under the existing roof for drainage purposes. Can I place the purlin on the bottom side of the rafters and screw the tin directly to the rafters on the top side?