Spudland_Dave
Well-known member
Situation... I discovered it was much easier & smarter to finish & sheetrock the wall prior to installing the LM3800's...no biggie on my front wall, all electrical was done, couple rolls of insulation and voila...done. But over on the rear side door, I'm not exactly ready...I was hoping to run the power for those exterior lights off a new (yet to be installed) sub panel in the rear of the shop to save on wiring.
SOOO. I was thinkin...what if I wire up those lights as I normally would, but start the feed up in the attic area in a junction box? Once I get my new 2nd sub panel installed, I just string a line to the J-box and i'm done?
Question is...should I avoid Junction boxes whenever possible or is it really nothing to worry about?
Plan B would mean hooking up those 2 lights up into a string of recepticles I plan on putting close by...actually 12" away close by.. I was just trying to avoid that on the grounds of keeping things segemented nicely and I didnt want to use 12-2 in the lighting fixtures.
SOOO. I was thinkin...what if I wire up those lights as I normally would, but start the feed up in the attic area in a junction box? Once I get my new 2nd sub panel installed, I just string a line to the J-box and i'm done?
Question is...should I avoid Junction boxes whenever possible or is it really nothing to worry about?
Plan B would mean hooking up those 2 lights up into a string of recepticles I plan on putting close by...actually 12" away close by.. I was just trying to avoid that on the grounds of keeping things segemented nicely and I didnt want to use 12-2 in the lighting fixtures.