To avoid these ads, REGISTER NOW!

Just ordered some ghost shield.

Ron_J

Well-known member
Joined
Jul 10, 2018
Messages
295
Location
Central PA
They poured the concrete Monday (15th), and it was power troweled.

I was under the impression that you were supposed to wait 30 days to put the 4500 on, but I've read a couple places where they said 14 days. Anyone done it after 14 days and had trouble?

Also, what about the sprayers to put them down? I have a cheap hand sprayer (for weed killer and such) that looks like it will work for the 4500, but the 8510 says to use a chemical resistant sprayer. Will my cheap sprayer work long enough to cover 1440 sf?
 
To avoid these ads, REGISTER NOW!
OP
R

Ron_J

Well-known member
Joined
Jul 10, 2018
Messages
295
Location
Central PA
USE A GOOD SPRAYER

Wait 28 days

I'm feeling real cheap right about now, but $150 for a sprayer that I will only use once? Will one of the cheap weed and feed sprayers last long enough to spray 1440 sf? Even if I have to buy 2 and throw them both away at the end.

Unless they will not give as good of results?
 
To avoid these ads, REGISTER NOW!

tff

Well-known member
Joined
Dec 25, 2017
Messages
423
Location
Greer, SC
I used a paint roller and squeegee for both. Very easy to put down that way. And used a brush in the corners.
 
To avoid these ads, REGISTER NOW!