Had slab poured yesterday. Will be 36 wide x 28 deep, 2 doors 9 x 8 and 16 x 8. I work from home so will have office finished above the area behind the 16 foot door ( 22 feet total ) 10 foot ceilings down for that 22 feet, the remaining 14 feet ceiling will be vaulted ( behind 9 foot door) installing 2 post lift there. trying to work out details for floor, downstairs walls, upstairs for office will use sheetrock. Im learning there's a lot to consider with each decision I make...looking forward to getting some tips and pointers from those who went before me ;-)