Kevin, are you talking about the old roof line that will now be inside ?
If the trusses arrive on Monday, will they be going up on Tuesday or Wed ? Weather permitting.
Yes, the old roof line will be inside, but I am going to block off the area above with drywall. What is below though will stay. I was thinking about cedar siding and keeping the vinyl soffit so it still looks like it's outside, but then I was thinking about just drywalling the complete area. I could keep my toolbox there, but I was also thinking about a bar with a TV behind it. So many options, so little time. LOL!!!!
Trusses SHOULD be here Monday, but Craig also has another job going on about 20 miles north of me. He had to pour curbs for a large parking lot for a factory. The quicker he gets that done, the quicker he gets paid. All he has left is to strip the forms off, and backfill some dirt. I may just tell him to go ahead and do that to get that finished up, then he can devote his time down here. If he gets that done on Tuesday, then trusses would be Wednesday or Thursday for setting them.
I know that he has been trying to work both jobs with the weather permitting, and I know that a factory really doesn't like to wait. Plus I told Craig that if he has other quick paying jobs to go ahead and knock them out. Ashton (the neighbors son) and I can do some things, plus I also have a few parts I need to work on for a fellow member, so that takes a day or so right there. And I have some dirt to move and have Craigs skidloader, so I can get that knocked out at my pace.
We are going to strip the roof tomorrow though and get that ready, plus we still have to build the wall back to the existing roof, then we have to build our rafters to tie things together. So if we don't get the rafters set, we still have a little to do first.
I guess I might have answered your question by bouncing all over the place?

I'm multi-tasking right at the moment so I'm a little scatter-brained with my answers.