babzog
Well-known member
Not garage related but it needs to be built anyway. We want to enclose it in a cabinet since it's by the new front entrance and we want it to look nice, etc. Couple of contractors were humming and hawing over how to build it (and we could see they really didn't want to tackle it). So fine, I'll do it myself.
Here's the opening for it. The space to the right of the half wall now houses the washer and drier.
I bought the melamine and a countertop and spent some time drawing up the plans. The countertop will be sawn up and used to assemble the top which is really just for looks. The tub will be supported from underneath by a shelf, thus eliminating the legs. The cabinet will just be a basic carcass with a bottom shelf and a mid shelf (to support the tub). We're also placing it at a height comfortble for us so we'll have about 19" of vertical space between the shelves.
I needed a way to cut up the melamine sheets and knew that finding help would be a challenge. So a bit of net scouring led me to construct a supportive "sled" for the sheet. I had some extra 8' or so 2x4's and a couple of 5 footers. Cut some notches in the shorter pieces, placed them on my sawhorses and laid the long 2x4s into the notches.
With the 4x8 sheet on top:
Getting ready to make the first cut on my saw board (just unclamped it today):
Rought edge of melamine (on left side of pic) is now trimmed away and the cut to set the height of the sides is now cast in stone (or melamine):
I was getting ready to cut the sides out but it started to rain. Again.
Put it all away and will pick it up again in the next few days (weekends are in such short supply with the wife planning activities, etc). The sled is working really well! Sheet is supported nicely, making cutting this stuff a one man job. When done, it just pops apart and the boards store away neatly.
Will post more pics as construction progresses.
Here's the opening for it. The space to the right of the half wall now houses the washer and drier.
I bought the melamine and a countertop and spent some time drawing up the plans. The countertop will be sawn up and used to assemble the top which is really just for looks. The tub will be supported from underneath by a shelf, thus eliminating the legs. The cabinet will just be a basic carcass with a bottom shelf and a mid shelf (to support the tub). We're also placing it at a height comfortble for us so we'll have about 19" of vertical space between the shelves.
I needed a way to cut up the melamine sheets and knew that finding help would be a challenge. So a bit of net scouring led me to construct a supportive "sled" for the sheet. I had some extra 8' or so 2x4's and a couple of 5 footers. Cut some notches in the shorter pieces, placed them on my sawhorses and laid the long 2x4s into the notches.
With the 4x8 sheet on top:
Getting ready to make the first cut on my saw board (just unclamped it today):
Rought edge of melamine (on left side of pic) is now trimmed away and the cut to set the height of the sides is now cast in stone (or melamine):
I was getting ready to cut the sides out but it started to rain. Again.
Put it all away and will pick it up again in the next few days (weekends are in such short supply with the wife planning activities, etc). The sled is working really well! Sheet is supported nicely, making cutting this stuff a one man job. When done, it just pops apart and the boards store away neatly.Will post more pics as construction progresses.
Last edited:

and none had mentioned anything else (one guy mentioned a stainless sink but the ones I priced at HD were over $300 - forget that!), I decided to tackle it myself. I'm committed now (and for not a lot of money.. I'll tally it up when I'm done but probably around $150 by the time the water's running).