sands35
Well-known member
I'm a few days away from laying down conduit in a trench. Any hints and tips? Specifically wondering if I should layout the pipe and glue it next to trench and then lay it down or glue it up and drop it in as I go?
One of those jabs that is pretty messy with glue and dirt and want to hear some best practices 1st.
Thanks!
One of those jabs that is pretty messy with glue and dirt and want to hear some best practices 1st.
Thanks!