Hello,
I will be installing a 90A sub-panel in my detached pole building garage.
When I run the ground wire to the 2 rods, how long of a run can it be?
I'd like to put the ground rods about 50 feet away from the panel and run the ground wire inside of the interior wall then exit it to the rods that will be outside.
Can I just drill a whole thru the metal wall panel to run the wire to the outside rods or is there a neater way?
Lastly, does the sub-panel main breaker need to be at a particular height off the ground?
Thanks
I will be installing a 90A sub-panel in my detached pole building garage.
When I run the ground wire to the 2 rods, how long of a run can it be?
I'd like to put the ground rods about 50 feet away from the panel and run the ground wire inside of the interior wall then exit it to the rods that will be outside.
Can I just drill a whole thru the metal wall panel to run the wire to the outside rods or is there a neater way?
Lastly, does the sub-panel main breaker need to be at a particular height off the ground?
Thanks