Well after a couple more feeble attempts by Olympic to fix the issues, then two cancelled appointments followed by three weeks of no contact I finally had it and told them I am getting another company to fix the door sealing issues on both my overhead and passage doors as well as any other repairs my overhead door requires and will be sending them the bill, and if it is not paid they will hear from my lawyer. Funny how they got back to me in less than two hours and APPROVED me to go ahead!

I am so glad I don't have to deal with them anymore!

On a side note I had my final electrical inspection on Aug 2 and passed with flying colors!
 
To avoid these ads, REGISTER NOW!

Blk88GT

Well-known member
Joined
Mar 16, 2009
Messages
1,066
Location
Manitoba
After reading your build, I'm glad I decided to build myself rather than pay Olympic.

May I ask, who did your concrete and what did it set you back?
 

winnipegtibook

Well-known member
Joined
Jun 3, 2010
Messages
300
Location
100 miles from Tolstoi
Sorry to hear you are having such issues with Olympic. I have heard "mixed" things about them. Was interested in building with them, but considering I wasn't building your standard garage, it didn't make sense. BLK88GT, PM sent (re-concrete)
 

socapots

Well-known member
Joined
Jan 3, 2011
Messages
544
Location
Canada
how is the building doing?
have not been around the site in awhile and came across your topic again.
Finally into some planning for my own place. Hope to get something on the ground this summer. see how it goes i guess.
 
OP
F

FatFenderBowTie

Well-known member
Joined
Aug 16, 2010
Messages
273
Location
Manitoba boonies
Well Winnipeg Overhead Door came exactly when they said they would, were very courteous, and were shocked that my door only had one brace on it (were even more shocked to find that was Daytonas bandaid fix for originally installing none). He also wasn't impressed with the cheap vinyl weatherstripping that was installed with about 4x too many screws, which they could have probably used a normal amount if 90% of the ones removed weren't metal self tapping screws rathe than wood screws.

The deflection in the door is minimal now in comparison to what it was, and no more light to be seen around the door!

Only ha to phone Olympic twice to get them to pay the invoice (finally paid two weeks late and only after mentioning contacting my lawyer)

Now to get the passage door fixed and paid for and all will be well!
 

FunkyfullWidth

Well-known member
Joined
Oct 3, 2011
Messages
1,238
Location
Three Rivers, ma
What kind of clearance do you have with the lift and garage door? Any issues putting a car up with the garage door up at the same time? I'm really diggin this mezanine. I've been planning on one, but on a much smaller scale. Now you've got me thinkin. I have roughly the same dimension as yours except I have two 10x12 doors with the man door on the side.
 

NotV8

Active member
Joined
Feb 6, 2013
Messages
26
nice... i read the whole thread... will be building mine this year too. almost same size... 32'x42'.
 

Micscience

Well-known member
Joined
Aug 22, 2012
Messages
140
I like this build mainly because it is different and it looks comfortable place to just hang out in. Good Luck man
 
OP
F

FatFenderBowTie

Well-known member
Joined
Aug 16, 2010
Messages
273
Location
Manitoba boonies
Thanks for all the comments...love the finished result so far, it is just unfortunate the sales and management staff dropped the ball when it came to follow up.
 
OP
F

FatFenderBowTie

Well-known member
Joined
Aug 16, 2010
Messages
273
Location
Manitoba boonies
Well that rule of thumb that no matter how big you build it won't be big enough came true...wanted a place to store/dry firewood and wanted a place for my wife to store all her gardening supplies and some lawn equipment.

Had the original old storage shed that came with the house when we purchased it, but had to move it when I built my shop...used it to store items until the shop was done...

javuta5a.jpg


Also made cool looking yard art!

So stripped it for any good material and used the base as well as two of the walls...

amumepur.jpg


a5y6e3y8.jpg


Then built my own joists...

qa7ete5y.jpg


Got it all in place and waited for the steel to be fabricated...

y4a9uze8.jpg


ydubapan.jpg


Then the real cold weather hit, but managed to get the walls wrapped and some of the trim done...

evyzejaq.jpg


avyguse5.jpg


Temperatures are supposed to be better this weekend so hoping to get the roofing and remaining trim at least started, but they are also calling for 4-8" of snow and blowing snow! YAY!
 
Last edited:
To avoid these ads, REGISTER NOW!

sean Buick 76

Well-known member
Joined
May 7, 2013
Messages
3,221
Location
Edmonton Alberta
I just found this thread today and went through the whole thing.... NICE work, and two big thumbs up from another Canuck!

I really like the mez, and the T top Cutlass is really cool too!
 
OP
F

FatFenderBowTie

Well-known member
Joined
Aug 16, 2010
Messages
273
Location
Manitoba boonies
And for outside updates...just got my shed done on the weekend
4enu9y6e.jpg

Bought a bike so some other priorities got pushed to the side!
LOL
 
Last edited:

NotAProfessional

Active member
Joined
Aug 2, 2014
Messages
25
Location
Rural Northern California
Glad you are still here. Just some dimensional information.

1) What is the height of the posts? I thought I read somewhere that they were 7'2" but is that the height of the posts plus the beams?

2) Are the beams 2x2x12's?

3) It looks like you put a ledger on each side of the beams and used that to support the joists. If I'm seeing that right, what is the size of the ledgers? 1.5x1.5?

4) Do you think 6x6 posts were needed?

5) Were the 6x6 posts pressure treated? I can't seem to find anything other than pressure treated in that size.

6) If you didn't have the heated floors would you have gone with the full post bases (http://www.homedepot.com/s/6x6+post+base?NCNI-5)? If so, and if you were building in an area that dips below 32 degrees only 10 to 15 days per year, and even then almost never drops below 23 degrees, do you think the 1/2 post bases would be ok? The 1/2 post bases are less than 1/2 the cost of the regular post bases.

7) Are the knee braces 4x4 or 2x4 pieces of wood?

8) Anything else about the construction of the mezzanine that isn't obvious from your great pictures?

I'm sure I'll have more questions!

Thanks
 
OP
F

FatFenderBowTie

Well-known member
Joined
Aug 16, 2010
Messages
273
Location
Manitoba boonies
Ok let me tackle this...LOL

1) 6X6 are cut 7'2" with the beams sitting on top, so I have 7'2" headroom under the mezzanine.

2) the beams are twinned 2X10's PL'd and nailed together, where the meet on top if the posts there is also a 2X8 sandwiched on either side coated in PL to add extra strength

3) Ledgers are ripped 2X4's to sit flush under the 2X8's

4) Used 6X6 for the big bulky look...liked the aesthetic look, not sure if they were really needed, but extra strength doesn't hurt....LOL

5) Posts are pressure treated as they are sitting on the concrete and cut end is up, ends touching the floor were also coated with en cut for added protection.

6) Never thought of this as the plan always was heated floors...I would talk to a local engineer to see what they think.

7) Knee braces are 2X4, everywhere they meet the 6X6 and 2X8 is coated with PL as well as all the ledgers and ends of 2X8 where they **** against the beams and ledgers were coated with PL

8) Nothing I can think of...drawings were done for the mezzanine for me by a draftsman who overkills everything, and I even went a little bigger than was required for the decking, also decking is T&G, and all beams, joists and T&G were PL'd prior to install. Not a squeak when you are up there!
 

NotAProfessional

Active member
Joined
Aug 2, 2014
Messages
25
Location
Rural Northern California
I admit to not understanding the 2x8's mentioned in step 2. If the beams are twinned 2x10' that takes up 3" of the 6x6 (which is really 5.5x5.5). If you then put a 2x8 on each side you have already used 6 full inches. Adding the ledger would mean the ledger is not supported by the posts. So I must be misunderstanding something.

By the way, the rim joists are 2x12's, right? Or are they also 2x10's?

Thanks again.
 

pennsylvaniaboy

Well-known member
Joined
May 28, 2014
Messages
417
I am lost on the picture above. Is that a board you ripped to be 2"? the ledger is not a stock sized piece of lumber?
 

Leftlane86GT

Member
Joined
Nov 25, 2013
Messages
12
What great build and great looking shop. Can you give me a ball park of the money you have ******* in just the mezzanine. Not cabinets and shelving. Just the wood. I am wanting to build one in my garage but would like to have an idea on the cost.
 