After getting the runaround from some contractors trying to get quotes for a pole barn I am back to considering doing it myself. I only have two real concerns. The first is setting the poles. I plan on using perma columns (basicly 5 foot pre-cast concrete columns). The area I want to put the barn slopes about 2' over 36' in length so it will need to be leveled. After scraping off all of the top soil am I better off filling and leveling the site first or drilling the holes and setting the perma columns first. Setting the columns first seems easier as it would be less drilling for the holes and I could use them to set the proper height for the finished floor in the barn. On the other hand I am concerned that the columns may move and shift as I backfill and compact the area. Thoughts? What have you done?