Leveling concrete

Woodsrider

Active member
Joined
Aug 15, 2008
Messages
30
Location
Ontario, Canada
2 car attached garage. The concrete floor was poured about 6 years ago and was hand trowelled. In the first 6 feet, the floor drops 2 inches and then is somewhat level all the way out to the door.
I'm not sure yet what kind of floor I want, but I do want this section to be level for my cabinets or at least correct the floor to slope out.
Would it be easier to just grind out the high area or fill the floor to slope out to the door?
Or, can I just leave it and epoxy or VCT right over it?

Thanks
 