Well tomorrow the last pieces I need to finish the mini split are coming. But I do want to double check a couple things.
I figure I will post the general procedure and how I understand it and then ask the questions at the end.
For reference the system is a
(1) LG 30k Multi Zone Mini Split (LMU300HHV)
(2) LG 12k Ceiling Cassette ( LCN128HV4-NG)
Now most of the install procedures and videos online for mini splits tend to be for a single unit (over a multi zone) and the main difference is there is generally only 1 service port. However the LG has a service port for both the gas and the liquid. Heres a picture (top is Gas bottom is Liquid)
So then the procedure. Which from the manual seems pretty simple but it also talks about connecting to BOTH the Gas and Vapor service ports.
So start with the nitrogen pressure test
Then the Deep Evacuation
And finally going to the charging portion
So now for questions....
1) Since the procedure is to do both the Vapor and Gas lines, do I do them individually? Or "T" them together? Or should I take my manifold gauge set (yellow jacket one) and connect the low side line to one port and the high side to the other and then do the test/vacuum through the "middle" line?
Really I guess that is my main question. I understand the whole procedure its just a bit different than most of the information you see online since it wants to use both service ports vs most information online uses a single port so want to double check!
Thanks in advance and sorry its a bit long of a post!
I figure I will post the general procedure and how I understand it and then ask the questions at the end.
For reference the system is a
(1) LG 30k Multi Zone Mini Split (LMU300HHV)
(2) LG 12k Ceiling Cassette ( LCN128HV4-NG)
Now most of the install procedures and videos online for mini splits tend to be for a single unit (over a multi zone) and the main difference is there is generally only 1 service port. However the LG has a service port for both the gas and the liquid. Heres a picture (top is Gas bottom is Liquid)
So then the procedure. Which from the manual seems pretty simple but it also talks about connecting to BOTH the Gas and Vapor service ports.
So start with the nitrogen pressure test
Then the Deep Evacuation
And finally going to the charging portion
So now for questions....
1) Since the procedure is to do both the Vapor and Gas lines, do I do them individually? Or "T" them together? Or should I take my manifold gauge set (yellow jacket one) and connect the low side line to one port and the high side to the other and then do the test/vacuum through the "middle" line?
Really I guess that is my main question. I understand the whole procedure its just a bit different than most of the information you see online since it wants to use both service ports vs most information online uses a single port so want to double check!
Thanks in advance and sorry its a bit long of a post!