I will be getting my shop slab ready for concrete soon. It will have 2 XPS for radiant heating. I will be installing a 4 post lift and leaving the tubing out of the lift column area. Should the XPS be removed as well or can the columns sit on that? Using 25 PSI green board from Lowes. Also going to have a free standing steel mezzanine sitting on the slab with 6 columns bolted down. Wondering the same thing here. On my last shop I removed the foam under my lift columns leaving it thicker but think its better to have more uniform base. Just making sure the foam can support the lift and mezzanine.
