boat2230
ALLIANCE MEMBER
I have my 10ga wire to ceiling with enough extra to come to middle of post on lift and either a disconnect box or make a plug on end of pump wire and plug end on supply 10 ga wire. Going to use junction box at ceiling and run it in enclosed grey stuff or the flexible tubing from junction box to lift. Questions are if I go with plugs can I hard wire plug to 10 ga wire or does it need to transition to a cord type first. Second is disconnect box or plug safest way?
Lastly have seen people wire a cord into switch on pump so that they can take it to opposite side of lift to operate pump while positioning lift. What type of switch and housing is recommended and obviously cable for 220 30 amp or what is need to add and secondary remote switch attached by a cord- preferably impact resistant ?
Lastly have seen people wire a cord into switch on pump so that they can take it to opposite side of lift to operate pump while positioning lift. What type of switch and housing is recommended and obviously cable for 220 30 amp or what is need to add and secondary remote switch attached by a cord- preferably impact resistant ?