Lariatstang
Member
I'm having my concrete poured in the next couple of days in my pole barn. I would like to plan for a lift down the road. My concrete guy told me he can dig out the area where I'm going to place my lift posts to make the floor thicker for more support.
I don't have a lift yet, way over budget on the build right now so this will be a future add on. I'm seeing there's a bit of a variance in the distance between posts on a lot of the 2 post lifts. (I'll be getting a 2 post). Is there roughly a standard distance between posts where I can plan for most lifts? I need to let the concrete guy know toughly where my placement will be.
Also my building is designed to be a drive through (overheard doors on both sides opposite of each other) I'd like to place the lift as far back toward the rear door as possible and still be able to put a vehicle on it without it sticking out of the door. What's the typical clearance I should have on the front/back of the lift?
Let me see some pics of anyone who's done this before!
I don't have a lift yet, way over budget on the build right now so this will be a future add on. I'm seeing there's a bit of a variance in the distance between posts on a lot of the 2 post lifts. (I'll be getting a 2 post). Is there roughly a standard distance between posts where I can plan for most lifts? I need to let the concrete guy know toughly where my placement will be.
Also my building is designed to be a drive through (overheard doors on both sides opposite of each other) I'd like to place the lift as far back toward the rear door as possible and still be able to put a vehicle on it without it sticking out of the door. What's the typical clearance I should have on the front/back of the lift?
Let me see some pics of anyone who's done this before!