Dilemma,
OKay so I ordered a 4 post lift about 3 mths ago and it arrived just after Christmas and is sitting in my attached garage.. Anyways because of the cold weather my detached garage build start date has been delayed till May 1st due to 9ft frost still in ground. So my questions is:::
Should I setup 4 post lift in attached garage with 13ft ceilings for the time being and be able to do a clutch job on Skyline, oil change, exhaust swap on Lo Rider?
Or should I wait another 3 mths(3 mths completion is thinking positive) till detached garage is built and assemble in there where it will permanently reside?
Assemble or Wait?????
Thanks,
Parrish
OKay so I ordered a 4 post lift about 3 mths ago and it arrived just after Christmas and is sitting in my attached garage.. Anyways because of the cold weather my detached garage build start date has been delayed till May 1st due to 9ft frost still in ground. So my questions is:::
Should I setup 4 post lift in attached garage with 13ft ceilings for the time being and be able to do a clutch job on Skyline, oil change, exhaust swap on Lo Rider?
Or should I wait another 3 mths(3 mths completion is thinking positive) till detached garage is built and assemble in there where it will permanently reside?
Assemble or Wait?????
Thanks,
Parrish