I have been searching, but depending how you label this configuration I see different answers.
I am using multiple switches to control multiple LED fixtures. I had intended on pulling in a hot and a neutral for each fixture, but got wondering is it permissible to run a single neutral from the service panel to the first junction box then start feeding the neutral from there to the other fixtures ?
Here is a drawing of what I am talking about, although I will be using more switches, and LED lights.
I am pulling in 12 gauge THHN using a single circuit breaker.
I calculate with all the LEDs lit I will draw 6 amps.
I am using multiple switches to control multiple LED fixtures. I had intended on pulling in a hot and a neutral for each fixture, but got wondering is it permissible to run a single neutral from the service panel to the first junction box then start feeding the neutral from there to the other fixtures ?
Here is a drawing of what I am talking about, although I will be using more switches, and LED lights.
I am pulling in 12 gauge THHN using a single circuit breaker.
I calculate with all the LEDs lit I will draw 6 amps.