misterfixit
Well-known member
I'm getting really close to completing the shop build, I'll do a thread once done. I'm about to order an A/C unit, looks like it'g gonna be a 2T heat pump system. The shop has metal siding, "MaxRib" is what it is called, very similar to R-panel with different profile. I will have 1" of closed cell foam inside. My question is what are folks doing to run the line sets through the wall?