yossarian19
Well-known member
The garage isn't heated yet (no insulation. It's on the list) so it's a bit chilly / damp in there.
The laminated workbench top, which I'd left to dry for two days, failed on one seam as I manhandled it onto the frame. The glue was still wet. I applied some more glue & re-clamped it.
Given 40-50 degrees & rainy over the next week, when can I expect this thing to be cured?
Lamination is green Doug Fir (shoulda bought kiln dried)
The laminated workbench top, which I'd left to dry for two days, failed on one seam as I manhandled it onto the frame. The glue was still wet. I applied some more glue & re-clamped it.
Given 40-50 degrees & rainy over the next week, when can I expect this thing to be cured?
Lamination is green Doug Fir (shoulda bought kiln dried)
