Active member
Hi Everyone,
I upgraded my electrical panel and converting my garage to an ADU to make some extra income. I added two-meter spots so the ADU can pay for their electricity separately. I pulled a permit for the main house as an electrical panel upgrade and ran all new outlets and wires. Also got another electrical permit for the ADU. The Los Angeles Department of Water and Power (LADWP) is asking for plot plans (which I have), line diagram (which i created in Excel, and a Load schedule. I need these things to get a meter spot to move forward with my inspections. Does anyone know how to create a load schedule? I put the new panel in the same location as the old one. I'll have my fingers crossed and hope LADWP doesn't make me move it. Thanks in advance.
Edit:
I need a load schedule for my house and the ADU
I upgraded my electrical panel and converting my garage to an ADU to make some extra income. I added two-meter spots so the ADU can pay for their electricity separately. I pulled a permit for the main house as an electrical panel upgrade and ran all new outlets and wires. Also got another electrical permit for the ADU. The Los Angeles Department of Water and Power (LADWP) is asking for plot plans (which I have), line diagram (which i created in Excel, and a Load schedule. I need these things to get a meter spot to move forward with my inspections. Does anyone know how to create a load schedule? I put the new panel in the same location as the old one. I'll have my fingers crossed and hope LADWP doesn't make me move it. Thanks in advance.
Edit:
I need a load schedule for my house and the ADU