Hi folks - I hired an excavator to remove all organics and get me down to a solid, (close to) level base for my pole building. It's excavated 1ft over all around.
I'm a little hung up on surrounding grade and where to set finish floor height. Front right corner is the highest surrounding grade, with front left of building ~7" lower. There's an 8' porch on the left that's shallowly excavated, but surrounding grade there is nearly 11" lower than highest (font-right).
My plan was finish floor (concrete) 6" above highest surrounding grade. But that would put front left corner (inside concrete) nearly 11" high (7"+6"). Outside the porch, I can only adjust grade so much near that left-hand tree. Even factoring the porch being 3-4" lower than inside finish floor, that porch would be pretty high.
So, considering that front right corner seems to be a bit of an outlier, I'm thinking just setting inside finish floor 2-3" above that highest. At least I won't have to grade up surrounding everywhere else so aggressively? And the rest of the building would still be*well*above surrounding to avoid water ingress.
Does this seem like a valid, calculated risk?
PS not that it matters for the above questions but FYI I'll be bringing sub-base up with recycled concrete, with 4-5" 3/4- beneith 2" XPS, then 4-5" concrete. Also due to site restrictions this was the only place to build. Lack of trees otherwise this the decision to try to keep them.
Thanks in advance.


I'm a little hung up on surrounding grade and where to set finish floor height. Front right corner is the highest surrounding grade, with front left of building ~7" lower. There's an 8' porch on the left that's shallowly excavated, but surrounding grade there is nearly 11" lower than highest (font-right).
My plan was finish floor (concrete) 6" above highest surrounding grade. But that would put front left corner (inside concrete) nearly 11" high (7"+6"). Outside the porch, I can only adjust grade so much near that left-hand tree. Even factoring the porch being 3-4" lower than inside finish floor, that porch would be pretty high.
So, considering that front right corner seems to be a bit of an outlier, I'm thinking just setting inside finish floor 2-3" above that highest. At least I won't have to grade up surrounding everywhere else so aggressively? And the rest of the building would still be*well*above surrounding to avoid water ingress.
Does this seem like a valid, calculated risk?
PS not that it matters for the above questions but FYI I'll be bringing sub-base up with recycled concrete, with 4-5" 3/4- beneith 2" XPS, then 4-5" concrete. Also due to site restrictions this was the only place to build. Lack of trees otherwise this the decision to try to keep them.
Thanks in advance.


Last edited: