Looks like most of the members here are across the pond where I guess the building regulations are a little different to what we have here in the UK.
Thought I would start from the beginning with this and let you see how we do things this side of the pond.
I started in June 2008 and finished in March 2010. Hope you enjoy the process.
I did as much as I could myself to keep the cost down so the only experts I employed were the block layers and the roughcaster.
This is the plot of land where the garage will be sited. I have already cut down the trees, all 10 of them. They were over 85 feet tall and it was not a pleasant or easy job cutting them down.
This is the Plan of the garage floor. It will be almost 33.5 feet by 22 feet and will have a pit at one side
This is the Front Elevation. A double door to the left and a single to the right. The door clearance height is 7.8 feet
.
Let the work commence......
What a day....All the treee stumps have been removed and digging of the foundations has started. This was not without problems as one of the tracks came off the excavator and I had to call the company to find out how to release the tension to refit the track.....
All very easy if you are Charles Atlas, but we did get it back on after a bit of huffing and puffing.....
These pictures do not show the true size of the stumps as the largest is oner 4 foot tall
.
After 3 days work we now have the foundations dug out.
Because I wanted a pit in the garage the soil has had to be removed from all the right hand side because the tree rootes had broken up the earth making it impossible to remove just the pit area :duh:
Daughter stayed over last night and decided this morning that she wanted a go of the excavator
Thought I would start from the beginning with this and let you see how we do things this side of the pond.
I started in June 2008 and finished in March 2010. Hope you enjoy the process.
I did as much as I could myself to keep the cost down so the only experts I employed were the block layers and the roughcaster.
This is the plot of land where the garage will be sited. I have already cut down the trees, all 10 of them. They were over 85 feet tall and it was not a pleasant or easy job cutting them down.
This is the Plan of the garage floor. It will be almost 33.5 feet by 22 feet and will have a pit at one side
This is the Front Elevation. A double door to the left and a single to the right. The door clearance height is 7.8 feet
Let the work commence......
What a day....All the treee stumps have been removed and digging of the foundations has started. This was not without problems as one of the tracks came off the excavator and I had to call the company to find out how to release the tension to refit the track.....
All very easy if you are Charles Atlas, but we did get it back on after a bit of huffing and puffing.....
These pictures do not show the true size of the stumps as the largest is oner 4 foot tall
After 3 days work we now have the foundations dug out.
Because I wanted a pit in the garage the soil has had to be removed from all the right hand side because the tree rootes had broken up the earth making it impossible to remove just the pit area :duh:
Daughter stayed over last night and decided this morning that she wanted a go of the excavator