I apologize if this isn't supposed to be on GJ but I hang here a lot and don't really have anything to show for it so I thought I would share our master bath remodel.
If you were to come to my house you would probably think there is nothing to complain about. It's a beautiful house and we are very lucky to have it. Short story is that we bought during the housing crisis on a short sale so it was very cheap considering what its market value was when it was built in 2004 (we purchase in 2009). The only real issues are the Master bath was done with a lot of builder grade materials and the basement is only partially finished.
What started out as a painting project turned into us looking into refinancing for a remodel. Come to find out our house is now worth over $100k more than we paid for it (thanks economy!!). So we were able to refinance our mortgage with quite a bit of money on top and still only pay $6.00 more a month than what we were currently paying with our old mortgage (with a yearly rebate!).
So we went ahead with it and the first order of business is the master bath. As I said it was a lot of builder grade stuff that looked a lot cheaper than the rest of the house. Also the stand up shower was too small even for my wife and I (who are not big people) and we had only used the spa tub about 4 times in the last 4 years. So instead of painting and putting in new counter tops we are going whole hog with a remodel that includes:
New tile all around
New vanity with new top, bowls and fixtures
A shower will now go where the tub is and be fully tiled with a European glass wall type of vibe. Dual heads and controls w/a bench
The current shower will become a custom built linen closet (there isn't one in the house currently)
The toilet stays in its current location but a 20" LED TV will go above it for morning news and what not while getting ready
New mirrors and sconces over the vanity area and bench in a soon to be vacant spot for sitting and what not (for wife)
I am paying to have the work done because I have zero experience with construction/plumbing/tile work and really don't have the time to learn as I go (that will be for the basement remodel!). So I may lose some street cred points but work and family consume a lot of time!
Before Pics:
As of yesterday.
I will try to update everyday or at least when there is something to report out. The window is getting filled in so that will probably be next after the rest of the demo is done and things are moved out!
If you were to come to my house you would probably think there is nothing to complain about. It's a beautiful house and we are very lucky to have it. Short story is that we bought during the housing crisis on a short sale so it was very cheap considering what its market value was when it was built in 2004 (we purchase in 2009). The only real issues are the Master bath was done with a lot of builder grade materials and the basement is only partially finished.
What started out as a painting project turned into us looking into refinancing for a remodel. Come to find out our house is now worth over $100k more than we paid for it (thanks economy!!). So we were able to refinance our mortgage with quite a bit of money on top and still only pay $6.00 more a month than what we were currently paying with our old mortgage (with a yearly rebate!).
So we went ahead with it and the first order of business is the master bath. As I said it was a lot of builder grade stuff that looked a lot cheaper than the rest of the house. Also the stand up shower was too small even for my wife and I (who are not big people) and we had only used the spa tub about 4 times in the last 4 years. So instead of painting and putting in new counter tops we are going whole hog with a remodel that includes:
New tile all around
New vanity with new top, bowls and fixtures
A shower will now go where the tub is and be fully tiled with a European glass wall type of vibe. Dual heads and controls w/a bench
The current shower will become a custom built linen closet (there isn't one in the house currently)
The toilet stays in its current location but a 20" LED TV will go above it for morning news and what not while getting ready
New mirrors and sconces over the vanity area and bench in a soon to be vacant spot for sitting and what not (for wife)
I am paying to have the work done because I have zero experience with construction/plumbing/tile work and really don't have the time to learn as I go (that will be for the basement remodel!). So I may lose some street cred points but work and family consume a lot of time!
Before Pics:
As of yesterday.
I will try to update everyday or at least when there is something to report out. The window is getting filled in so that will probably be next after the rest of the demo is done and things are moved out!

