akpolaris
Well-known member
I have a pour today.. 840 sq ft floor that is going inside an established footing. I realize that they will not meet seamlessly. Is there a material that I can use to fill the groove that will be left or develop. I believe that there is an epoxy material that I can trowel into the void like grout.. Any ideas or products
Thanks
Thanks
