Skrutinizr
Member
- Joined
- Nov 2, 2014
- Messages
- 8
I've been anxious to do my floor, but there's a central drain and the floor is sloped towards the drain. My concern was tiles wouldn't form to the floor, but a mat would have to be done in two parts (it's 20x24) and if the mats form better to the floor, there would be a gap between them in the middle.
How does one deal with this? I'm going to try to measure the slope, but I would guess there's probably 2"-3" or so difference compared to a flat floor. The end result may be doing one half of the garage with a mat, then painting or tiling the other side.
How does one deal with this? I'm going to try to measure the slope, but I would guess there's probably 2"-3" or so difference compared to a flat floor. The end result may be doing one half of the garage with a mat, then painting or tiling the other side.
