73 Mustang Bill
Well-known member
- Joined
- May 27, 2011
- Messages
- 124
I had my garage built almost two years ago, and knew that some day I'd get a MaxJax. I told the concrete guy that I needed at least 4 inches of depth, and would prefer 5. He said that he was giving me 5.5 inches. Stupid me, I trusted him without checking it before it was poured. I also asked for (and paid for) 3500 psi concrete.
I drilled my first hole for my new MaxJax and found out the depth is only 3.5 inches. The sumbitch lied to me. I wonder now if I even got my 3500 psi concrete, as I never saw the invoice from the concrete company.
I have an email into Dannmar to see if there is anything that can be done, but it's going to be a couple days (posted this on Saturday afternoon). Anyone else have this problem, and how did you solve it? I have a nice epoxy/polyurethane floor, and would hate to have to cut some pads and repour concrete.
Oh, and my concrete guy is OFF my Christmas card list.
I drilled my first hole for my new MaxJax and found out the depth is only 3.5 inches. The sumbitch lied to me. I wonder now if I even got my 3500 psi concrete, as I never saw the invoice from the concrete company.
I have an email into Dannmar to see if there is anything that can be done, but it's going to be a couple days (posted this on Saturday afternoon). Anyone else have this problem, and how did you solve it? I have a nice epoxy/polyurethane floor, and would hate to have to cut some pads and repour concrete.
Oh, and my concrete guy is OFF my Christmas card list.



