Hello all.
I have a couple of questions regarding metal ceiling installation that I was hoping some others with experience could weigh in on.
I am using metal ribbed panels purchased directly from Morton.
Questions:
1) I have j-channel that gets installed around the perimeter of the room at the ceiling. Do I overlap the channel at the joints? Or just **** the channel sections up to one another?
2) Is there a recommended location to start the panels on the ceiling? I.e. from the middle of the room and then working out to either side? Or do I just start laying them in at one end and then working my way across to the other side of the room?
Thanks in advance for any tips. Looking forward to getting this ceiling up and the heat installed before the weather really sets in.
Brian
I have a couple of questions regarding metal ceiling installation that I was hoping some others with experience could weigh in on.
I am using metal ribbed panels purchased directly from Morton.
Questions:
1) I have j-channel that gets installed around the perimeter of the room at the ceiling. Do I overlap the channel at the joints? Or just **** the channel sections up to one another?
2) Is there a recommended location to start the panels on the ceiling? I.e. from the middle of the room and then working out to either side? Or do I just start laying them in at one end and then working my way across to the other side of the room?
Thanks in advance for any tips. Looking forward to getting this ceiling up and the heat installed before the weather really sets in.
Brian