BDFabrizio
New member
I've tried searching for previous posts on this subject but haven't been able to find exactly what I'm looking for. I'm sure it's been asked thousands of times and for that I apologize.
I recently bought a house in south Mississippi that doesn't have a garage. It was an awesome deal and I've got a ton of equity in the property (nearly 50k). My dilemma is that I need a garage/workshop to hold all my tools and project cars. currently all my stuff is piled into one of the spare bedrooms.
My plans are for a 30x40x12 shop with one big bay door and one walk in door. I do have plans of installing a lift at some point so that makes a minimum of a 4" slab necessary. My budget is roughly $15-20k.
What's the best way to secure funding? Home equity line of credit, or a personal loan? I'm honestly not sure how that all works. Could I set a 5 year loan like you would with a vehicle? Also, is 15-20k a realistic price for a metal building like I want? I've seen kits for anywhere from 7-11k. I figure 3 or 4k for a slab and another 2 or 3 to have it put together. I'm sure having it wired will be expensive.
I'm really just looking for some opinions of people who've done what I plan to do and what to look out for.
I recently bought a house in south Mississippi that doesn't have a garage. It was an awesome deal and I've got a ton of equity in the property (nearly 50k). My dilemma is that I need a garage/workshop to hold all my tools and project cars. currently all my stuff is piled into one of the spare bedrooms.
My plans are for a 30x40x12 shop with one big bay door and one walk in door. I do have plans of installing a lift at some point so that makes a minimum of a 4" slab necessary. My budget is roughly $15-20k.
What's the best way to secure funding? Home equity line of credit, or a personal loan? I'm honestly not sure how that all works. Could I set a 5 year loan like you would with a vehicle? Also, is 15-20k a realistic price for a metal building like I want? I've seen kits for anywhere from 7-11k. I figure 3 or 4k for a slab and another 2 or 3 to have it put together. I'm sure having it wired will be expensive.
I'm really just looking for some opinions of people who've done what I plan to do and what to look out for.
