I’m getting ready to side our Barndominium build that has 1/2” OSB and has been wrapped with synthetic and I was wondering what you guys usually do at the bottom of 3 rib siding panels. I will have the metal base trim but should I be installing inside closure strips at the base too? What about at the top of the siding panels? I’m assuming I install the closure strips at the bottom atleast but I wondered if vented would be better too. Just looking for some input! Thank you.