Ok, I am about to start screwing the metal siding to my uprights. It is on a steel frame carport/shed. Do I start at the top and work down? or at the bottom and work up? If bottom up, how do I get to the top to screw it down? It is a 20 x 18 by 10 ft high structure...and the siding is 20 ft long.
I understand that the overlap has to be top over bottom, but can't I go from top and lift edge, slide next one under and proceed?
thanks for any help....