brokenjack
Member
I'm trying to figure out how to run my conductors from my meter base to my panel. If I put the meter base directly behind the service panel, my screws will hit the panel. Can I run the wires from the meter base through the studs if I offset my panel. I can't seem to find a decent web page on this. My studs are 2x4 and my service will be single phase 200amp.
Thanks
Thanks

