Hi,
Apologies in advance if this has been asked. I've been searching an cannot find anything that seems to cover my answer.
I am installing a new 200 amp Home D meter/breaker combo. Since this is for a pump house the county is requiring I run my own service entrance cables underground. I'm getting really confused about grounding of the panel. I was planning on running 4/0 4/0 2/0 through conduit underground from the panel to their closest service pole. I've been told mixed information on whether this needs to have a ground wire as well (so four wires in total in the conduit - two hot, a neutral, and a ground).
However, I'm confused as to whether I need to run a ground wire through the conduit to the county electric pole since I am installing to 8' ground rods, six feet apart from the base of the service panel, and will be grounding at the panel? So do I run a ground wire in the conduit? Only ground on the ground rods at the panel? Or both?
My plan was to just run three wires in the conduit (the two hots and a neutral) to the county service pole, and separately run the ground out of the bottom to 2 8' ground rods. I'm attaching a picture of my panel with my belief of what needs to be done. Hopefully someone can just offer some advice. Thank you in advance.
Apologies in advance if this has been asked. I've been searching an cannot find anything that seems to cover my answer.
I am installing a new 200 amp Home D meter/breaker combo. Since this is for a pump house the county is requiring I run my own service entrance cables underground. I'm getting really confused about grounding of the panel. I was planning on running 4/0 4/0 2/0 through conduit underground from the panel to their closest service pole. I've been told mixed information on whether this needs to have a ground wire as well (so four wires in total in the conduit - two hot, a neutral, and a ground).
However, I'm confused as to whether I need to run a ground wire through the conduit to the county electric pole since I am installing to 8' ground rods, six feet apart from the base of the service panel, and will be grounding at the panel? So do I run a ground wire in the conduit? Only ground on the ground rods at the panel? Or both?
My plan was to just run three wires in the conduit (the two hots and a neutral) to the county service pole, and separately run the ground out of the bottom to 2 8' ground rods. I'm attaching a picture of my panel with my belief of what needs to be done. Hopefully someone can just offer some advice. Thank you in advance.