Ok guys the time has come where I’d like to add xtra space in our shop and build the mezzanine I had envisioned.
I have a general idea of how I might construct it but have some questions on a few things.


above are some pictures for you guys to see what I’m working with here.
When the building was put up I asked the builder to install a ledger board for a mezzanine in the wall dividing the shop from the cabin. They ended up using large ring shank nails to attach a 2x10” to the posts rather then bolt an lvl beam or the like to it.
My thoughts now are to buy a 36’ 1 3/4 x 9.5” lvl beam and bolt it over the 2x10” ledger board with 1/2 or larger lag bolts into the columns in that wall? I guess the other thing that comes to mind is to pull that 2x10” off but I know it’s going to be a pain in the *** with the ring shank nails and I don’t see how it would affect it if kept on??
Second question is that I will set the 6x6 treated post into the ground 4ft deep on a concrete puck then sack Crete and back fill. I would set the posts holding the mezzanine out at 8ft in line with the posts on the side of the shed and I was then thinking of buying another 36’ lvl as a header to run across the posts and have my floor joists attach to etc. my plan is to cantilever 2x10 floor joist 2ft over the header for a total size of 36’ x10’ mezzanine.
So big question is can one lvl 9.5 x1 3/4” work as the header and how many posts will I need to carry the load over the 36’ wide of the mezzanine?
I won’t be parking cars on top of it but I might put some 400 or 500lbs things and also shelving for storage to clean up the shop floor etc.
Sorry for the long rambling lol
Sent from my iPhone using Tapatalk
I have a general idea of how I might construct it but have some questions on a few things.


above are some pictures for you guys to see what I’m working with here.When the building was put up I asked the builder to install a ledger board for a mezzanine in the wall dividing the shop from the cabin. They ended up using large ring shank nails to attach a 2x10” to the posts rather then bolt an lvl beam or the like to it.
My thoughts now are to buy a 36’ 1 3/4 x 9.5” lvl beam and bolt it over the 2x10” ledger board with 1/2 or larger lag bolts into the columns in that wall? I guess the other thing that comes to mind is to pull that 2x10” off but I know it’s going to be a pain in the *** with the ring shank nails and I don’t see how it would affect it if kept on??
Second question is that I will set the 6x6 treated post into the ground 4ft deep on a concrete puck then sack Crete and back fill. I would set the posts holding the mezzanine out at 8ft in line with the posts on the side of the shed and I was then thinking of buying another 36’ lvl as a header to run across the posts and have my floor joists attach to etc. my plan is to cantilever 2x10 floor joist 2ft over the header for a total size of 36’ x10’ mezzanine.
So big question is can one lvl 9.5 x1 3/4” work as the header and how many posts will I need to carry the load over the 36’ wide of the mezzanine?
I won’t be parking cars on top of it but I might put some 400 or 500lbs things and also shelving for storage to clean up the shop floor etc.
Sorry for the long rambling lol
Sent from my iPhone using Tapatalk