I am building a mezzanine that will be 20'x24'. The 24' length is the way I plan to put floor joists...I want the floor to handle 20k pounds. I am planning to put double 11-1/4" x 2" LAMS paired up at both ends and a pair 5' in from each end for a total of 8 LAMS. I will then joist hang dimensional 2x12s to complete the floor structure.
Can anyone confirm if this is sufficient structure?
Can anyone confirm if this is sufficient structure?





