71blackcheyenne
Well-known member
Finally starting a build thread, even though the building was already up last fall we didn't pour the floor until today, anyway heres some pics for you guys to check out, the building is 40x48x16 stick frame....
First the ground work, stripping topsoil, & pouring the grade beam
First the ground work, stripping topsoil, & pouring the grade beam