Milesvdustin's 40x64x10 Build Thread!!!

OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Finally have the meter pad and everything wired in. This weekend I will be getting a trencher and hooking up my secondary into my main panel.

Only took them 10 days of off and on work to get it in.
 
To avoid these ads, REGISTER NOW!
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Just got done pulling 175' of mobile home feeder in conduit. Ran a trencher all morning and did the rest today.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Just about have the conduit finished, just need to finish into the meter and under the wall into the garage. I fired the plumber the contractor hired after many delays. Found another local contractor who will start Wednesday and be finished by Friday. Gutters tomorrw Concrete next week!!!!
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
IMG_4139.jpg

Gutters are finished, this week I will dig in the drainage pipes for them.

Plumbers start today, they already had their mini ex inside ready for digging yesterday.
IMG_4137.jpg
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Just spoke to the contractor, concrete will be happening next week in two pours. One Tuesday, one Wednesday. Garage doors will be installed on Friday of next week.

Then, I get to order a bunch of lumber and start the fun part!
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Finished burying the electric entrance behind the barn. Only need to hook up the power line in the meter and bury that end. Saturday I will pound in the ground rods and connect them up and bury all of that, and finish my gutter drains.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Went out today to work on the gutter drains. Got one side completed, will finish the other tomorrow. The contractor came out and compacted the fill and laid vapor barrier and mesh to get ready to pour next week.

IMG_4180.jpg

IMG_4181.jpg

The pipes are buried now, didnt take that picture. Imagine a lot of dirt.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Got the meter side of the power line hooked up and completed. Tonight I finish the other side of the gutter drain system then bury it all. Once I finish grade the sides with new topsoil I will extend the drain popups a few inches to grade level.

First half of the concrete pour happened today. Wife said it looked great! I will have some pictures of it on here later if I make it out of work in time.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Here is the best shot of the first half I could get.

IMG_4288.jpg

Power troweled nice and smooth
 
To avoid these ads, REGISTER NOW!
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
All the concrete is finished! Now I wait for the garage doors which should be tomorrow or Friday. Ordering all my framing lumber on Friday I hope.
IMG_4314.jpg

IMG_4316.jpg
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Question for my ceiling framing. Original plan was to use joist hangers and nail them all up. I saw a product called a purlin saddle hanger. Looks much easier to set and requires a couple fewer nails per side. Would that work well? The only weight will be the drywall and lights. PFD28B is the simpson part number.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
One of those nailers is on my list, as is a good framing nailer. I will likely borrow one. I have an arrow electric finish nailer.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
IMG_4373.jpg

Got the panel in and mounted in my first wall section this weekend. Was helping family all weekend otherwise. I just have piles of lumber laying around right now.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
Got my 60 gallon compressor hooked up along with a 20 amp outlet, both temporary for the framing stage. Once I start wiring I will make them permanent.

I feel like I hit a huge milestone, power!!!!


Also got garage doors today, finally.
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
IMG_4407.jpg

Here she is with the doors down! They are 10x9 insulated with liftmaster wall mount openers. Tonight, I start framing the walls in!
 
OP
M

mrpizza

Well-known member
Joined
Nov 1, 2011
Messages
2,935
Location
IL
So a lot has happened since I last checked in. I am preparing for drywall this weekend. I just need to mount my pocket door frames and install my lighting and ceiling fan stuff. No progress on the garage side, that will start once I get the house complete.

Here are some pics of the current setup. Walls are all framed, and spray foam insulation is completed. I do not have pictures of the ductwork, they put that in yesterday.

IMG_4891.jpg

IMG_4890.jpg

I just realized it has taken me a month to go from bare shell to framed, insulated, wired, plumbed, and ready for drywall. Its been one heck of a month of late nights after work!
 