I need to install a culvert at the entrance of my new lot. Only constraint I am given is 15" min ID. Going with dual wall corrugated plastic. Due to the angle, pitch, etc. of the existing ditch and surrounding ground, it will only have about 3" of fill on top (not the standard 12"). To install it with 12" coverage would create a sort of mound to drive over. Has anyone here actually installed a 15" ID dual wall culvert with only a few inches of fill on top and had construction vehicles (well drilling rig, dump trucks with bulldozer trailers, ect.) drive over it? Hoping to find someone who has real world experience with this and not speculation based on internet searches. Thanks!
