tonydanzah
Well-known member
I finished this a year ago at work, found the pictures recently. Figured I would share them.
testing out the concept
welding up lower frame, all 3/8 square tubing
frame finished installing casters
testing box on casters
no pictures of upper frame fabrication. final assembly
ill add more pictures next week. I have added several tool holders.
testing out the concept
welding up lower frame, all 3/8 square tubing
frame finished installing casters
testing box on casters
no pictures of upper frame fabrication. final assembly
ill add more pictures next week. I have added several tool holders.
