I have a modine hot dawg 100k heater. My shop is 40x40 with 14 foot ceilings. I plan on hanging the modine down from the ceiling about 5-6 ft on allthread 3/8". This way it is closer to the floor for drying stuff and warming when it -40 outside in the winter. I have never used the superstrut or unistrut with the spring nuts to hold the allthread in place. The channel is bolted to the ceiling through the bottom chord of the trusses and is secure, the spring nuts slide into the channel and the allthread screws into it and tightens. Then the other end of the allthread will screw into the top of my modine. Anyone have any suggestions or done this before? Used the spring nuts, etc.