1dumbquestion
Active member
- Joined
- Jun 18, 2012
- Messages
- 26
Hey all, I'm planning my shop build and am debating between a mono and a traditional slab floor. I can do the excavation work but will have to hire out the forms/labor. I'll be building the rest of the shop myself so the concrete will be a rather large part of the total cost. I like the idea of the traditional stem wall so I don't have studs getting oiled when things go wrong but I am open to your thoughts as I haven't done a ton of concrete work. Are there other pro's and con's? Are the labor costs a lot more generally with a foundation/slab? I'm planning a 30'x60' but may have to pull back a little as I get a better feel for total cost. Thanks for any input, 1
