ITSWILL
Well-known member
I am planning out my build and I have realized that this is a game of hundreds, a hundred here and there really adds up in the end.
I will have 3 guys to put the trusses in. By building is going to have 14ft side walls and gambrel trusses spanning 40 ft. The peak of the trusses once in place will be about 26 ft.
Also this is pole barn cnstruction and I will have a dirt floor when installing the trusses.
Right off the bat, I was planning to rent a telehandler (Lull), which I'm pretty confident would do the trick.
Is there a better way or a less expensive way?